Cheverton
- Boat REF# · 23055
- LOA · 7.31m
- Year · 1978
- Construction · GRP
- Underwater profile · Full-displacement
- Engine · 1 x Diesel 80hp, Perkins 4236 (1978)
- Lying · nr Pembroke, Pembrokeshire
This boat is off the market but here are some boats that are still For Sale
Extra Details
Designer | R.N |
---|---|
Builder | Anderson-Rigden + Perkins Ltd. |
Lying | nr Pembroke, Pembrokeshire |
Fuel capacity | 90.0 ltr (19.8 G) Total - 2 Tanks |
Mechanical
Engine | 1 x Diesel 80hp |
---|---|
Engine make and model | Perkins 4236 (1978) |
Engine Hours | Not Recorded |
Engine Cooled | Indirect |
Steering | Wheel |
Drive | Shaft |
Prop(s) | 3 Blade Bronze |
Fuel consumption (approx) | 7.0 ltr (1.5 G) /hour At Cruising Speed |
Cruising speed (approx) | 6 knots |
Max speed (approx) | 10 knots |
Dimensions
LOA | 7.31m |
---|---|
LWL | 6.70m |
Beam | 2.40m |
Draft Min | 0.60m |
Headroom | 1.80m |
Electrical Systems
12 volt battery, 2 batteries charged by: engine
Construction
Construction | GRP |
---|---|
Underwater profile | Full-displacement |
Finish | Gelcoat finish |
Accommodation
Bench seating throughout the boat, as is normal for admiralty tenders.
Accommodation
Bench seating throughout the boat, as is normal for admiralty tenders.
Deck Gear
Cockpit cover |
---|
1 anchors
(Danforth 25lb)
4.00m of chain
25.00m of warp
Nav Equipment
Navigation lights | |
---|---|
Echo sounder |
Safety Equipment
Life buoys | |
---|---|
Horn | |
Emergency steering |
2 bilge pumps (1 manual / 1 Electric)
Firefighting equipment.
Broker's Comments
The Royal Navy don't mess about when it comes to having boats built for them, this is no exception. Solid, purposeful and well engineered she is, pretty she is not. She may be a bit odd looking but her general arrangement will suit someone. This boat has been viewed and photographed by Mike of Boatshed Wales. Register or log in to see more photos of this boat. These boat details are subject to contract.
Note: Offers on the asking price may be considered.